Façade Retention Challenges & Solutions

Façade retention projects, where the external face of a building is preserved and a new structure is built behind it, are a familiar sight in cities across the UK. These projects are instant sources of controversy because they tread the line between the need for expanding housing stock where it is needed the most and the sensitive issue of preserving architectural heritage. Beyond this debate, façade retentions pose unique problems to the on-site contractor who is tasked with making the connection between old-and-new work.

Challenges

From a technical standpoint, historic façades that are destined to become part of a modern external envelope must be updated to meet current building standards in terms of airtightness and thermal performance. As the point of preserving a façade is to maintain its external appearance, improvements like air barriers and insulation must be added to the façade’s internal face. Considerations for how new materials (e.g.: non-breathable rigid insulation) will interact with retained materials (e.g.: breathable stone façade), and any thermal bridging resulting from the new structure being physically attached to the old, must be taken into account to avoid interstitial condensation risk potential.

Material selection must balance performance with practicality as all new materials installed on the inside of a façade will determine how much internal space is left over. For example, while the vapour permeability of mineral wool insulation may seem a good match for historic breathable façades, the bulkiness of the material may encroach so much into internal spaces as to make them unfit for purpose. Upgrading a façade from the inside may be further complicated if a building’s frontage does not have sufficient space or local permissions for the temporary support structure to be erected externally, meaning contractors will have to work in a web of constricted space formed by temporary steel framing built within the construction site itself.

Solution

Clearly, the interface between what is replaced and what is retained is of fundamental importance to addressing the challenges of air leakage and thermal bridging in façade retention projects. Wraptherm®, a composite material combining the vapour-permeable properties of Wraptite® external air barrier with ultra-thin Spacetherm® aerogel insulation, offers a simple and compelling solution.

Wraptherm is installed to the inside face of retained façades via its self-adhering backing and is compatible with almost any substrate. Installation process is simple and straight-forward, and the resulting airtight seal limits the heat loss associated with air leakage through gaps and cracks in the façade. As both components of Wraptherm are vapour-permeable, the material helps to offset any negative effects that upgrades may have on the natural movement of water vapour through the building envelope. As well as protecting the existing building fabric, Wraptherm’s hydrophobic properties provide a secondary barrier against water ingress by tightly sealing door and window penetrations. Finally, the 10mm layer of aerogel insulation limits cold bridging by providing an effective thermal break between the cold external façade and the new warm internal structure.

Wraptherm’s combination of airtightness and excellent thermal performance benefits internal spaces by reducing the amount of additional insulation required to meet standard, reduces interstitial condensation risk by providing a continuous thermal break across the façade interface, and by potentially making other wall elements like the vapour control layer unnecessary. The unique installation method and manageable format speeds up the installation process and makes working in confined areas easier.

  • Wraptherm Product

    Wraptherm® is a composite comprising 10mm Spacetherm Insulation blanket bonded to the face of Wraptite vapour permeable, airtight self-adhesive membrane.

    More Info


  • Technical Enquiry Form

    Book Your CPD Presentation

    In order to fulfil your CPD presentation request, we need to store and process your data as follows:

    • Use your phone number to arrange CPD delivery.
    • Use website cookies to analyse how you got to our website & what you did while you were here.

    Zoom Presentation Request

    Free Sample & Brochure Request

    In order to fulfil your Free Sample & Brochure Pack request, we need to store and process your data as follows:

    • Use your mailing address to send your sample & brochure.
    • Use your email address to send you a confirmation email.
    • Use your phone number to check you've received what you requested.
    • Use website cookies to analyse how you got to our website & what you did while you were here.

    Sample & Literature Request

    Material Sample

    Zoom Meeting

    CAD Detail Review

    Request A Calculation

    Zoom Presentation

    Specification Check

    Latest News

    Contact Us

      8:30am - 5pm, Mon - Fri

      01250 872 261

      01250 872 727

      

      A. Proctor Group Ltd., The Haugh, Blairgowrie, PH10 7ER

     

    Testimonials

    APG-LOGO

     

    Innovative Construction Products for Over 80 Years.