Messingham Primary School - Roofshield

Messingham Primary School

The Roofshield vapour and air permeable underlay, supplied by the A. Proctor Group, was recently installed on the 1400m2 roof extension at Messingham Primary School, Scunthorpe for North Lincolnshire Council.

Following discussions with the A. Proctor Group’s team of highly experienced technical advisors, the benefits provided by the high performance Roofshield membrane were obvious to the specifiers.  The very low vapour resistance of 0.09MNs/g combined with high air permeability reduces the potential for interstitial condensation as far as is possible, and without the requirement to use a vapour control layer, thus giving a robust and dependable solution that can be specified with confidence.

This, in combination with Roofshield’s impressive
15-year track record, and the comprehensive specification advice provided by the A. Proctor Group throughout the design and installation period (not to mention full BBA certification for warm and cold roofs) allowed North Lincolnshire Council to breathe easy, safe in the knowledge their Primary School’s roof has a future as bright as that of the pupils.

 

 

Not found what you are looking for?

Post on the technical forum

 

 
 

 

Bookmark and share with: