Preliminaries

The floor laying team are to familiarise themselves with all materials and surfaces to be covered.

Where given, manufacturer's instructions for the use of floor-coverings are to be followed.

All floor surfaces are to be suitable for the application of Profloor Acoustic Mat.

All floor surfaces are to be prepared to the minimum levels covered by these application guidelines.

Surface Preparation

  • Remove any existing loose laid floor coverings ie: carpet, linoleum, sheet vinyl or similar.
  • Existing fixed (glued) floor coverings such as thermo- plastic or ceramic tiles need not be removed providing they are firmly fixed.
  • Renew any damaged or rotten floor boards.
  • Check there are no squeaking or moving floor boards. Screw fix any loose or squeaking floor boards.
  • Clean joints between floor boards of dust and dirt particles.
  • Ensure all fixings, nails, screws etc. are below the top surface of the floor boards.
  • Clean underside edge of skirtings to remove dust and dirt particles.
  • Ensure complete floor surface is dry, firm, free from grease, polish and mould growth.
  • Fill joints between floor boards and bottom edge of skirtings with a suitable mastic. (See figure 1.)
  • Very absorbent surfaces eg; untreated concrete, non-flooring grade chipboard or old floor boards may require the application of a suitable primer.

Application of Profloor Acoustic Mat

Measure and cut Profloor Acoustic Mat to the required size.
Note: The Profloor Acoustic Mat is to be measured and cut so that approximately 25mm is returned up around the skirtings. (See figure 2.)

If sand/cement screed is being applied over Profloor Acoustic Mat the return should be to the depth of the screed.

  • Roll up cut length with foam side facing out.
  • Apply Probond AM with a suitably notched trowel 2mm x 6mm, or similar tool, to the prepared floor surface to cover an area that can be covered whilst the adhesive remains receptive.
  • Apply the Profloor Acoustic Mat foam side to the wet adhesive and smooth out. (See figure 3.)
  • Apply Probond AM to remainder of floor area to be covered by cut piece and cover with remainder of Profloor Acoustic Mat and smooth out. Press firmly over the entire area, repeat after 30 minutes.
  • Subsequent pieces of Profloor Acoustic Mat are butt jointed. (See figure 4.)
  • Continue to lay Profloor Acoustic Mat until complete floor area is covered.
  • Where possible Profloor Acoustic Mat should be left to dry for 24-36 hours.
  • Trim surplus Profloor Acoustic Mat from around skirtings.
  • Cover complete area with final floor covering eg; Vinyl+ (sheet or tiles), carpet or carpet tiles. (See figure 5.)


+ Check with A. Proctor Tech Desk for specific advice and recommendations where Vinyl or Linoleum are to be used.